摘要
从环境的角度分析影响被动式营房施工进度的因素,建立被动式营房施工进度指标体系,以被动式营房活动持续时间为综合评价目标,确定预计工期,为被动式营房进度管理提供科学依据,提高计划管理与进度控制的科学水平,优化资源配置,提供工程建设效率。
This paper analyzes the factors affecting the construction progress of passive barracks from the perspective of environment,establishes the passive barrack construction progress indicator system, takes the duration of passive barracks activity as the comprehensiveevaluation target, determines the estimated construction period, to provide scientific basis for passive barracks schedule management,improve the scientific level of plan management and schedule control, optimize resource allocation, and provide engineering constructionefficiency.
作者
回月彤
白云
张艳菊
HUI Yue-tong;BAI Yun;ZHANG Yan-ju(Department of Logistics Support,Logistics University of People's Armed Police Force,Tianjin 300309,China)
出处
《价值工程》
2018年第30期11-13,共3页
Value Engineering
基金
武警后勤学院基础研究项目WHJ201607
关键词
被动式营房
环境因素
施工进度
综合评价
passive barracks
environmental factors
construction progress
comprehensive evaluation