浅议发展国内水电工程EPC工程总承包管理模式 被引量:2

Discussion on the Development of EPC Management Mode for Domestic Hydropower Projects
下载PDF
导出
摘要 现阶段,我国水电工程建设主要采用的是平行发包的工程项目总承包管理模式。国际上则更多采用EPC工程总承包管理模式,这一管理模式有着巨大的优势,那么如何才能在更好的在国内发展水电工程EPC工程总承包管理模式,成为当前研究的重点。本文首先概述了水电工程总承包管理模式的特点;其次分析了水电工程总承包管理模式的优点与缺点;再次探讨了水电工程施工总承包管理内容与模式;最后提出了几点建议。 At this stage, China’s hydropower project construction mainly adopts the parallel contracting management mode, and in the world, the EPC management mode is adopted more. This management mode has great advantages. How to develop the EPC management mode of hydropower project in China is the focus of current research. Firstly, this paper outlines the characteristics of the EPC management mode of hydropower projects. Secondly, it analyzes the advantages and disadvantages. Thirdly, it discusses the content and mode of EPC management mode of hydropower project. Finally, it puts forward several suggestions.
作者 海忠诚 HAI Zhong-cheng(China Water Resources Beifang Investigation,Design and Research Co.,Ltd.,Tianjin 300222,China)
出处 《价值工程》 2018年第29期74-75,共2页 Value Engineering
关键词 水电工程 EPC工程总承包管理模式 特点 要求 hydropower project EPC management mode characteristics requirements
  • 相关文献

参考文献5

二级参考文献1

  • 1GB/T 50358-2005.建设项目工程总承包管理规范[S],2005.

共引文献24

同被引文献7

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部