摘要 电动汽车充电站的施工过程,涉及多种建筑工程施工信息的融合,施工过程安全隐患较多;BIM技术由于其信息融合能力及过程可视化仿真能力已广泛应用于施工过程进行安全管理。本文介绍了充电站施工过程的特点和关键要素,对充电站施工过程危险源进行了分类,并对成因进行了分析;在此基础上,构建了基于BIM的充电站施工过程安全管理体系,为制定充电站安全施工组织方案及完善BIM技术在施工过程安全管理方面的应用提供了参考。 The construction process of electric vehicle charging station involves many construction engineering information, so there are many hidden dangers in the construction process. Due to its ability to information fusion and process visualization simulation, BIM(Building Information Modeling) technology has been widely used to manage the safety of construction process. The characteristics and key elements of the charging station construction process are summarized, and the dangerous sources in the construction process of charging station are classified. On this basis, the construction process safety management system of charging station based on BIM, which provides a reference for the establishment of the safety construction organization plan of the charging station and the application of the BIM technology in the safety management of the construction process.
作者 杨茜 王正权 YANG Qian;WANG Zheng-quan(Dalian Vocational & Technical College,Dalian 116035,China;Brilliance Bus(Dalian)Co.,Ltd,Dalian 116600,China)
出处 《价值工程》 2018年第29期78-80,共3页 Value Engineering
基金 大连职业技术学院重点课题(DZ2017A-04)
关键词 BIM 充电站 施工 安全管理 Building Information Modeling(BIM) charging station construction safety management
  • 相关文献

参考文献8

二级参考文献52

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2陶萍,罗刚.工程咨询公司全过程造价控制及效果评价研究[J].土木工程学报,2012,45(S2):258-261. 被引量:32
  • 3满庆鹏,李晓东.基于普适计算和BIM的协同施工方法研究[J].土木工程学报,2012,45(S2):311-315. 被引量:40
  • 4Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 5Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 6Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 7Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 8Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 9Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.
  • 10Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246.

共引文献1096

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部