摘要
结合实例分析了某煤业公司EBZ160掘进机二运电缆及运输轨道存在的问题,提出了加设电缆悬吊装置及增设二运缓冲跑车的措施,通过实践应用,电缆悬吊装置及缓冲跑车的应用取得了良好效果,具有较高的推广价值。
In this paper,based on an example,the specific problems existing in the second transport cable and the rail transportation of the EBZ160 digger in a coal company are analyzed,and measures of adding the cable suspension device and adding two buffer sports cars are then put forward. Through the practical application,it shows that the application of cable suspension device and the buffer sports car has obtained good effect,and it is of high popularization value.
作者
马卫勇
MA Wei-yong(Shanxi Hongyu Chengzhu Construction Engineering Co.,Ltd,Shuozhou Shanxi 038300,China)
出处
《机械研究与应用》
2018年第4期191-192,195,共3页
Mechanical Research & Application
关键词
掘进机二运
问题
改进
second transportation of roadheader
problems
improvement