东华水泥钢筋混凝土料仓快速加固修复施工

Rapid reinforcement and repair construction of Donghua cement reinforced concrete silo
下载PDF
导出
摘要 东华水泥公司配料站石灰石仓内壁磨损严重,采用一种新型混凝土料仓快速修复。施工过程包括料仓基层预处理、仓壁植筋、加固钢板、底部支撑钢板、两侧支撑钢板的处理、灌浆料调制、灌浆施工和养护步骤。该混凝土料仓快速加固修复技术通过对料仓加固修复区域进行在线快速修复,维修过程快速简单,修复强度高。 A new type of concrete silo is used for quick repair because the inner wall of the limestone silo at the batching station of Donghua Cement Co., Ltd. is seriously worn. The construction process includes the pretreatment of the silo base, the treatment of planting bar in the silo wall,reinforcement steel plate,bottom supporting steel plate, supporting steel plates on both sides, the preparation of grouting material, the grouting construction and the maintenance steps. The rapid reinforcement and repair technology of the concrete silo achieves quick and easy online repair of the silo reinforcement and repair area. The maintenance process is quick and simple, and the repair strength is high.
作者 李淑国 Li Shuguo(Shandong Donghua Cement Co., Ltd., Zibo 255000, China)
出处 《水泥工程》 CAS 2018年第2期87-88,91,共3页 Cement Engineering
关键词 混凝土料仓 快速加固 修复 灌浆料施工 concrete silo rapid reinforcement repair construction of grouting material
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部