摘要
通过FLAC3D模拟供水管道与区间隧道交叉段的顶管施工过程,研究供水管道顶管施工对既有区间隧道的影响。模拟结果认为施工引起的隧道变形以及裂缝控制均在允许的范围之内,不会影响轨道交通正常运营。
In order to study the effect of pipe jacking construction on the existing interval tunnel, the process of pipe-jacking of cross section of water pipe and interval tunnel is simulated by means of FLAC3D software. The simulation results show that the tunnel deformation and fracture caused by pipe jacking construction are within allowable limits, which will not affect the normal operation of rail transit.
作者
王红印
朱颖
WANG Hong-yin;ZHU Ying(Zhengzhou Rail Transport Co.Ltd,ZhengZhou 450000,Hena)
出处
《湖南工业职业技术学院学报》
2018年第2期15-18,32,共5页
Journal of Hunan Industry Polytechnic
关键词
顶管
上跨
区间隧道
供水管道
位移变形
轨道交通
pipe
jacking
interval tunnel
water pipe
displacement deformation
rail transit