本文以新加坡大士西延长线项目为依托,以高架桥预应力盖梁首次采用混凝土永久壳模施工为案例,详细阐述了盖梁壳模吊装上桥后的安装调整及测量监控方法、控制措施、控制指标及施工过程,相应结论可供类似工程参考。
Based on Singapore Tuas west extension project, this article, taking viaduct prestressed concrete plate beam that was first adopted to permanent shell mold construction as a case, elaborated in detail the installation adjustment and measurement control method for capping beam bridge on the shell mould lifting, as well as the control measures, control index and construction process, the corresponding conclusion could be used as reference for similar projects.