期刊文献+

煤矿井下巷道贯通测量技术及其精度控制 被引量:9

Holing Through Measurement Technology in Underground Roadways of the Coal Mine and Its Precision Control
下载PDF
导出
摘要 主要介绍山西A煤矿+770 m矿井贯通工程,对贯通工程中的所得数据进行分析,分析造成贯通精度的误差和减低误差的措施,对比分析了煤矿矿井映射校正误差和贯通精度的联系,井下巷道贯通总误差受井下导线测量、立井定向、地表变化等误差干扰,探讨分析能有效控制精度的手段。 This paper mainly introduced +770 m holing through project of A coal mine in Shanxi, analyzed the data obtained in holing through project, the errors in it and the measures that reduced errors, and compared and analyzed the connection between error correction by mapping and holing through precision in the coal mine. The total error of holing through in underground tunnel was disturbed by the errors in underground wire measurement, shaft orientation and surface change, etc.. This paper explored and analyzed methods to effectively control the precision.
作者 贾冬冬 JIA Dongdong(Lvliangshan Coal and Electricity Co.,Ltd.,Huozhou Coal Electricity Group Co.,Ltd.,Fangshan 033199,Shanxi,China)
出处 《能源与节能》 2018年第9期30-32,共3页 Energy and Energy Conservation
关键词 大型贯通工程 控制网 误差分析 测量精度 large-scale holing through engineering control networks error analysis measurement accuracy
  • 相关文献

参考文献3

二级参考文献17

共引文献34

同被引文献49

引证文献9

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部