摘要 介绍了变电站交流金属封闭开关柜技术改造工程中计量装置验收调试的常见问题,这些问题涉及互感器选型与试验、计量二次回路调试、远程抄表调试等问题,提出了解决这些问题的对策,提高了技改工程中计量专业的验收质量,确保计量装置准确、可靠。 This paper introduces the common problems in the acceptance and commissioning of the metering device in the technical transformation project of the substation AC closed switchgear cabinet. These problems involve the problems of the selection and test of the transformer, the debugging of the two circuit and the debugging of the remote meter reading and so on. The Countermeasures are put forward to solve these problems, and the metrology specialty in the technical reform project is raised. The quality of acceptance is to ensure that the metering device is accurate and reliable.
作者 王震 Wang Zhen(Inner Mongolia electric power(Group)Co.,Ltd.Xue Jia Wan Power Supply Bureau,Ordos InnerMongolia,010300)
出处 《电子测试》 2018年第16期108-109,共2页 Electronic Test
关键词 试验 调试 验收 计量装置 开关柜 test commissioning acceptance metering devices Switchgear
  • 相关文献

参考文献3

二级参考文献8

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部