摘要
结合阿尔及利亚南北高速公路项目,分析海外高速公路工程总承包合同管理的特殊性和要点,并详细阐述了各阶段的工作方法和应采取的预控措施,望可对类似工程有所帮助。
In connection with the Algeria North-South Expressway project, the special nature and main points of the management of overseas expressway general contracting contracts were analyzed, and the working methods and pre-control measures that should be taken at various stages were elaborated.Hopefully, similar projects could be helped.
作者
付承涛
唐恩宽
Fu Cheng-tao;Tang En-kuan
出处
《建筑技术开发》
2018年第15期49-50,共2页
Building Technology Development
关键词
项目评估
合同实施
索赔
project evaluation
contract implementation
claim