摘要
针对河南天池抽水蓄能电站下水库溢洪道消能工进行了优化试验研究,通过多种方案的对比分析,最终推荐方案使水流导向河床中部,并且充分扩散,增大了落水面积,大幅度减轻了对左岸的冲刷。
The Optimization design experiments of the energy dissipator of lower reservoir in Tianchi Pumped Storage Power Station have been conducted. The recommendations was selected through the scheme contrast and analysis. The water be guided toward the center of the riverbed and fully spread by the shape of flip bucke of the recommendations, which can reduce the scour of left bank greatly.
作者
朱友军
叶祥飞
Zhu You-jun;Ye Xiang-fei
出处
《建筑技术开发》
2018年第15期141-142,共2页
Building Technology Development