织金站既有站场改造施工要点

Key points for the reconstruction of existing stations in Zhijin Station
下载PDF
导出
摘要 针对织金站既有站场施工改造,分析在不影响车站正常运营的施工要点,分析了站改的必要性,以施工计划为技术蓝本,分析站改施工技术研究、施工要点及关键步骤,得出站改施工的关键要素,确保施工的质量和人员安全。 In view of the construction and reconstruction of the existing station in Zhijin station,the construction points that do not affect the normal operation of the station are analyzed,and the necessity of station reform is analyzed. The construction plan is taken as the technical blueprint,the construction technology research and construction key points are analyzed. Steps and the key elements of station construction are obtained to ensure construction quality and personnel safety.
作者 梁治胜 王勇 LIANG Zhi-sheng;WANG Yong(Graduate School,China Academy of Railway Sciences,Beijing 100081,China;Guiyang Bus Duty Section of China Railway Chengdu Bureau Group Co.,Ltd.,Guiyang 550002,China)
出处 《黑龙江科学》 2018年第18期110-111,共2页 Heilongjiang Science
关键词 站场 施工 道岔 Station Construction Turnout
  • 相关文献

参考文献6

二级参考文献11

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部