摘要
装配式建筑的施工工艺复杂,施工进度控制难度大。结合工程实际,指出了装配式建筑施工进度控制的关键性因素,包括结构拆分设计、构件生产及运输、现场备料及堆场、吊装机械选择、穿插流水组织、施工过程控制、人力资源配备等。通过分析每项关键性因素的原则和要求,并针对具体问题进行具体策划和实施,最终取得了理想的效果,可为类似装配式建筑的进度控制提供参考。
The construction technology of the prefabricated building is complex and the construction progress control is difficult. Combined with the engineering practice, the key factors of construction progress control over the prefabricated building have been pointed out, including the design of structural separation, the component production and transportation, the on-site preparation of building materials and storage yard, the selection of hoisting machinery, the cross and flow organization, the construction process control, the human resources allocation, etc. The ideal results are finally obtained by analyzing the principles and requirements of each key factor, and by making specific planning and implementation of related problems, which can provide references for the progress control over similar prefabricated buildings.
作者
严玉海
叶文启
何超
YAN Yuhai;YE Wenqi;HE Chao(Zhongtian Construction Group Co.,Ltd.,Shanghai 201102,China)
出处
《建筑施工》
2018年第9期1672-1674,共3页
Building Construction
关键词
装配式建筑
工程进度控制
穿插流水施工
结构安装
构件堆场
prefabricated building
project progress control
cross and flow construction
structure installation
component storage yard