摘要
本文根据互通内曲线钢箱梁桥跨越连霍高速施工实际情况,结合钢箱梁制造、运输、吊装等条件,分析探讨了钢箱梁安装节段划分、架设、焊接等方面的内容,可对类似工程有借鉴,以提升工程质量。
According to the construction practice of interconnected curvilinear steel box girder bridge spanning Lianhuo expressway, combined with the conditions of manufacturing, transportation and lifting of steel box girder, the paper introduces the contents of erection, erection and welding of steel box girder.
作者
韩民
李献勇
关冀
Han Min;Li Xian-yong;Guang Ji
出处
《建筑技术开发》
2018年第16期23-24,共2页
Building Technology Development
关键词
钢箱梁
曲线
节段划分
架设
steel box girder
curve
segment division
erection