古田溪一级电站引水隧洞充排水试验

Water Filling and Draining Test of Diversion Tunnel of Gutian Creek First Grade Power Station
下载PDF
导出
摘要 引水隧洞充排水试验是水电站建设的里程碑事件。充排水试验是对水电工程整体结构、建造质量的考验。充排水试验一般需间歇充水,分级稳压,通过分析古田溪一级电站引水隧洞充排水试验步骤及其成果,可对类似工程提供借鉴。 The filling and draining test of diversion tunnel is a milestone in the construction of hydropower station.The test of filling and draining is a test of the overall structure and construction quality of hydropower projects.The filling and draining test usually requires intermittent water filling and grading stable pressure.This paper mainly introduces the steps and results of the water filling and draining test of the diversion tunnel of Gutian Xi first grade power station, which is of reference to similar projects.
作者 沈文丰 Shen Wen-feng
出处 《建筑技术开发》 2018年第16期33-34,共2页 Building Technology Development
关键词 充排水 闸门 引水隧洞 稳压 filling and draining sluice gate diversion tunnel steady pressure
  • 相关文献

参考文献1

二级参考文献3

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部