期刊文献+

路桥施工中钻孔灌注桩技术研究 被引量:1

Study on Bored Pile Technology in Road and Bridge Construction
下载PDF
导出
摘要 在现代路桥工程钻孔灌注桩施工当中,近些年来我国施工技术及其施工管理获得了巨大的发展和进步,然而依然有一些施工技术和施工细节上的问题存在,影响着桥路施工质量。通过分析路桥工程钻孔灌注桩各项施工技术,探讨路桥施工中钻孔灌注桩的各项主要施工技术控制措施。 During the construction of cast-in-situ bored piles in modem road and bridge projects, great progress has been made in construction technology and construction management in China in recent years. Construction technology and its on-site management issues are a major problem that must be solved in the construction of bored piles for roads and bridges. A comprehensive analysis of the construction technology of bored piles for roads and bridges was conducted. The main construction technology control measures for bored piles in road and bridge construction were analyzed and discussed.
作者 杨正 Yang Zheng
出处 《建筑技术开发》 2018年第16期89-90,共2页 Building Technology Development
关键词 路桥施工 钻孔灌注桩 技术研究 road and bridge construction bored pile technical research
  • 相关文献

参考文献6

二级参考文献12

共引文献43

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部