摘要 介绍了秦山一期核电厂报警系统改造前的现状以及存在的设备老化、备件停产以及抗震性能不足等问题,并阐述了报警系统改造的必要性;同时从设备布置、电缆敷设和供电负荷等方面分析数字化改造的可行性;结合数字化报警系统的功能和特性要求,提出了系统改造范围、改造原则、设计方案,并介绍了报警系统在供电方式、信号接口、抗震能力、报警连锁操作等关键功能的设计和实施改进,最后比较了改造前后系统在可靠性、稳定性和灵活性方面的差异。 This paper introduces the background of the alarm system of Qinshan NPP-1 and the existing problems such as aging, production of spare parts and insufficient anti-seismic property. Meanwhile, the feasibility of modernization is analyzed from the aspects of equipment layout, cable laying and power supply load. Combined the functions and features of alarm system requirements, the proposed scope of system modernization, the modernization principle, the design scheme are provided, and also introduces the improvement of design and Implementation such as power supply scheme, signal interface, anti-seismic capability analysis, etc. Finally introduces the transformation and the differences for modernization in the issue of reliability, stability and flexibility.
作者 桑玮 潘卫华 魏健 Sang Wei;Pan Weihua;Wei Jian(l.Shanghai Nuclear Engineering Research and Design Institute,Shanghai,200233,Chin;GNNP Nuclear Power Operations Management Co.,Ltd.,Zhejiang,Haiyan,314300,China;Shenzhen Chance New Energy Scientific Instrument Co.,Ltd.,Guangdong,Shenzhen,518000,China)
出处 《仪器仪表用户》 2018年第11期55-58,7,共5页 Instrumentation
关键词 报警系统 数字化改造 设计与实施 主控制室 alarm system modernization design and implementation MCR
  • 相关文献

参考文献8

二级参考文献19

  • 1章旋,茆荣,季程煜.现场总线在国内火电站中的应用现状和前景[J].自动化仪表,2005,26(7):5-6. 被引量:2
  • 2李亚平,姚建国,黄海峰,曹阳,韩韬,宋鑫.SVG技术在电网调度自动化系统中的应用[J].电力系统自动化,2005,29(23):80-82. 被引量:72
  • 3王红,彭亮,于宗光.FPGA现状与发展趋势[J].电子与封装,2007,7(7):32-37. 被引量:26
  • 4.田湾核电厂数字化仪控系统说明书[Z].,2002-09..
  • 5IEC 62241-2004, Nuclear power plants. Main control room. Alarm Functions and Presentation[S].
  • 6The Engineering Equipment and Materials Users Association, Alarm Systems: A Guide to Design, Management and Procurement[M], 1999.
  • 7Regulatory Guide 1.97-1983, Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following An Accident, Revision 3[S].
  • 8蒋祖跃.秦山核电公司仪控综合改造(反应堆保护系统及其相关设备部分)可行性研究报告,2005.11-62.
  • 9CHAO Ping, XU Dongling. Detail stages 1-3 of the process engineering task description for the Reactor Protection System, Q1.E.GZY25.S.05SJ-0005, 2005. 1-23.
  • 10Tech. Reactor Protection System, Description of Overall Concept, Q1.E.GZY25.F.05SJ-0101, 2007.47-52.