摘要
针对盐矿水平对接井设计中,因地形地物限制而产生呆滞矿体、资源浪费和安全性问题展开研究,根据多年经验和已有的成功案例,对对接井组进行了设计,并提出了井下复杂情况的预防措施。
For docking in the design of well salt level,the dull orebody due to terrain restrictions,resource waste and safety study,according to their own experience and the existing successful cases,has carried on the design to docking group wells,and downhole complicated conditions of preventive measures are put forward.
出处
《山西建筑》
2018年第24期70-71,共2页
Shanxi Architecture
关键词
盐矿水平对接井
设计
预防措施
horizontal butting well of salt mine
design
preventive measures