期刊文献+

浅谈下坂地坝基廊道沉降变形及渗水处理 被引量:1

Discussion on subsidence deformation and seepage treatment of Xiabandi dam foundation corridor
下载PDF
导出
摘要 下坂地水库初期蓄水运行至2915m高程时,坝基廊道右岸施工缝变形增大并出现滴水现象。为保证水库正常蓄水及运行安全,采取帷幕补强灌浆、混凝土衬砌及挤密注浆桩等方式进行加固,有效地控制了渗漏量和变形缝的扩展,成效显著。处理措施可为类似工程提供借鉴。 Initial water storage of Xiabandi reservoir is operated to 2915m elevation. The dam foundation corridor right bank construction joint deformation is increased, and dripping phenomenon appears. Curtain reinforcement grouting, concrete lining, compaction grouting pile and other modes are adopted for reinforcement in order to ensure the safety of reservoir normal impoundment and operation, thereby effectively controlling the leakage and deformation crack extension with fruitful achievements. Treatment measures can provide reference for similar projects.
作者 苏来曼.司衣提 Sulaiman Siyiti(Xinjiang Xiabandi Water Conservancy Hub Project Construction Management Bureau,Kashi 844000,China)
出处 《水利建设与管理》 2018年第9期65-70,共6页 Water Conservancy Construction and Management
关键词 廊道沉降变形 渗水 帷幕灌浆 混凝土衬砌 corridor subsidence deformation water seepage curtain grouting concrete lining
  • 相关文献

参考文献2

二级参考文献1

  • 1水工建筑物水泥灌浆施工技术规范(DL/T5148-2001),电力部,2001.(12).

共引文献7

同被引文献12

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部