期刊文献+

复杂条件下地铁车站施工对邻近建筑物的影响分析 被引量:5

Analysis on Influence of Subway Station Construction on Adjacent Buildings Under Complex Conditions
下载PDF
导出
摘要 常州市轨道交通1号线定安路站位于市中心,地质条件复杂,周围建筑密集。为降低车站施工对邻近建筑物的影响,采用有限元软件MIDAS/GTS进行数值模拟,分析计算了该地铁车站施工过程中基坑及邻近建筑物的变形,并根据计算结果制定针对围护结构及地层的加强措施,保障地铁车站施工过程中建筑物的安全。 Ding'an Road station of Changzhou Subway Line No. 1 locates in the downtown area with complex geological conditions and crowded surrounding buildings. In order to reduce the influence of station construction on adjacent buildings,this paper uses the finite element software MIDAS-GTS to calculate the settlement and displacement of the foundation excavation and adjacent buildings. Then strengthen measures are decided according to the calculation results,and the safety of subway station and adjacent building is ensured.
作者 沈栋 SHEN Dong(Rail Transportation Engineering Co.,Ltd.of China Railway 19th Bureau Group Co.,Ltd.,Beijing 101399,China)
出处 《施工技术》 CAS 2018年第16期21-24,48,共5页 Construction Technology
关键词 地铁车站 基坑 施工 影响 subway stations foundation excavation construction influence
  • 相关文献

参考文献5

二级参考文献23

  • 1张成平,张顶立,王梦恕.深圳地铁施工影响区环境安全与第三方监测[J].中国安全科学学报,2004,14(5):47-50. 被引量:18
  • 2路美丽,刘维宁,李兴高.风险管理在城市地铁工程中的应用初探[J].中国安全科学学报,2005,15(5):96-100. 被引量:28
  • 3栾茂田,林皋,郭莹.土体稳定分析的改进滑楔模型及其应用[J].岩土工程学报,1995,17(4):1-9. 被引量:11
  • 4姚宣德,王梦恕.对地铁工程风险评估体系框架的研究[J].中国安全科学学报,2005,15(8):88-92. 被引量:16
  • 5Shields D, Chandler N, Gamier J. Bearing capacity of foundations in slopes [ J ]. Journals of Geotechnical Engineering, 1990, 116 (3): 528-537.
  • 6Graham J, Andrews M, Shields D H. Stress characteristics for shallow footings in cohesionless slopes [ J ] . CAN.GEOTECH. J., 1988, 25:238-249.
  • 7应惠清.基坑支护工程[M].北京:中国建筑工业出版社,2003.
  • 8CHANG, S B, MOON S J. A case study on instrumentations of a large tunnel crossing under the exiting subway structure[ A]. Proceeding of the KGS 2000 Spring Conference [C], 2000:56 - 59
  • 9SHARMA J S, HEFNY A M, ZHAO J, et al. Effect of large excavation on deformation of adjacent MRT tunnels[J]. Tunnelling and underground Space Technology, 2001, 16(1) :95 - 98
  • 10BURLAND J B, STANDING J R, JARDINE F M. Building response to tunneling, case studies from construction of the Jubilee Line Extension[A]. Project and Methods. London: Thomas Telford Publishing Volume Ⅰ[C], 2001:509 -545

共引文献72

同被引文献59

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部