基于BIM的土石坝4D模型在施工进度管理中的应用框架 被引量:6

Application Frame of 4D Model of Earth Rockfill Dam in Construction Progress Management Based on BIM
下载PDF
导出
摘要 为了解决土石坝施工BIM的构建问题,从而实现BIM技术在土石坝施工进度管理中的应用和推广,通过调研当前水利工程领域已采用的BIM软件,并分析其优劣,结合文献中的土石坝施工BIM构建方法,提出基于Autodesk平台简捷适用的土石坝施工BIM构建流程,从而建立基于BIM的土石坝施工进度管理框架。 In order to solve the construction of BIM for earth rockfill dam construction,the application and popularization of BIM technology in construction progress management of earth rockfill dam are realized. Through the investigation for BIM software used in for current water conservancy engineering field,and analyzing their advantages and disadvantages,combined with the construction method of BIM of earth rockfill dam in literature,the construction process of BIM model based on Autodesk platform is proposed,thus,the construction schedule management framework of earth rockfill dam based on BIM is established.
作者 王明明 陈代果 姚勇 吴澜 陈俊颖 WANG Mingming;CHEN Daiguo;YAO Yong;WU Lan;CHEN Junying(School of Civil Engineering and Architecture,Southwest University of Science and Technology,Mianyang,Sichuan 621010,China;Datang Diqing Shangri-la Electric Power Development Co.,Ltd.,Shangri-la,Yunnan 674400,China)
出处 《施工技术》 CAS 2018年第16期132-135,165,共5页 Construction Technology
关键词 土石坝 建筑信息模型 进度管理 构建流程 管理框架 earth rockfill dam building information modeling (BIM) schedule management construction process management framework
  • 相关文献

参考文献7

二级参考文献44

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2杰里·莱瑟林,王新.BIM的历史[J].建筑创作,2011(6):146-150. 被引量:47
  • 3尹习双,周宜红,胡志根,刘全,丁世来,李仕奇.基于虚拟现实的水电工程施工动态可视化仿真研究[J].系统仿真学报,2005,17(7):1690-1693. 被引量:33
  • 4詹伟,邱菀华.项目管理成熟度模型及其应用研究[J].北京航空航天大学学报(社会科学版),2007,20(1):18-21. 被引量:26
  • 5Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 6Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 7Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 8Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 9Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 10Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.

共引文献1121

同被引文献52

引证文献6

二级引证文献80

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部