南京五桥主桥水上施工期航标配布研究 被引量:2

Study on the distribution of navigation mark during the period of construction above water of main bridge of Fifth Nanjing Yangtze River Bridge
下载PDF
导出
摘要 南京长江第五大桥位于长江下游南京水道梅子洲汊道左汊中段,计划2017年3月1日正式开工建设,预计2020年11月30日完工。文章中介绍了主桥水上施工方案,对工程河段通航条件进行研究,具体分析了桥梁施工对航道条件与船舶航行的影响,根据相关规范、标准、规定等合理确定了工程水域航道布置调整方案,科学配布了主桥水上施工期航标。 The Fifth Nanjing Yangtze River Bridge, located on the middle section of the left branch of Meizi branch of Nanjing waterway at the downstream of Yangtze River, is planned to begin constructing at March 1,2017 and be finished at November 30, 2020. The water construction scheme of the main bridge was introduced and the navigation condition of the river section of the project was studied. The influence of bridge construction on channel condition and ship navigation has been analyzed. An adjustment plan for watercourse arrangement along the waters was made according to the related norms and standards. The navigation marks were arranged scientifically.
作者 杨兴旺 钱苏芬 郁倩倩 黄昭培 YANG Xing-wang;QIAN Su-fen;YU Qian-qian;HUANG Zhao-pei(Nanjing Fit Navigation Project Consulting Limited Company,Nanjing 210000,China;Nanjing Channel Office of Yangtze River,Nanjing 210000,China;College of Harbor,Coastal and Offshore Engineering,Hohai University,Nanjing 210098,China)
出处 《水道港口》 2018年第4期458-464,共7页 Journal of Waterway and Harbor
关键词 南京五桥 水上施工 航标配布 The Fifth Nanjing Yangtze River Bridge construction above water arrangement of navigation marks
  • 相关文献

同被引文献9

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部