摘要
为了研究温度、湿度、铺装厚度等因素对钢桥面防水体系层间粘结强度的影响,依托港珠澳大桥钢桥面铺装工程,通过正交试验对防水体系各结构组合粘结强度的敏感性进行了研究。结果表明:基于各组合粘结强度对拉拔速率的敏感性,确定了组合Ⅰ、Ⅱ、Ⅲ适宜的拉拔速率分别为50、10、10 mm/min;组合Ⅰ层间粘结强度的敏感性排序为:湿度>温度>底漆厚度,组合Ⅱ、Ⅲ层间粘结强度的敏感性排序为:温度>铺装厚度>湿度;通过比选试验,确定了组合Ⅰ、Ⅱ、Ⅲ的最优方案均为A2B1C1。
In order to research the effects of temperature, humidity,pavement thickness and other factors on the interlayer bond strength of the steel bridge surface waterproof system,this paper relies on the steel bridge deck pavement of the Hong Kong- Zhuhai-Macao bridge,the sensitivity of the bond strength of the various structural combinations of the waterproof system was stud- ied by orthogonal test. The results show that based on the sensitivity of the bonding strength of various combination to the pull- out rate,the optimum pull-out rate of combination Ⅰ、Ⅱ、 and Ⅲ was 50, 10 and 10 mm/min,respectively. The sensitivity of the bonding strength between the combination Ⅰ layers is:humidity〉temperature〉primer thickness,and the sensitivity of the bonding strength between Ⅱ and Ⅲ layers is:temperature〉pavement thickness〉humidity, the optimal scheme for the combination of Ⅰ、Ⅱ、Ⅲ is A2B1C1 through the comparison test.
作者
龚侥斌
李浩
谭振宇
吴传海
GONG Yaobin;LI Hao;TAN Zhenyu;WU Chuanhai(School of Civil Engineering,Guangzhou University,Guangzhou 510006,China;School of Highway,Chang'an University,Xi'an 710064,China;Guangdong Hualu Communications Technology Co.Ltd.,Guangzhou 510420,China)
出处
《新型建筑材料》
北大核心
2018年第8期139-142,146,共5页
New Building Materials
基金
广东省交通运输厅科技项目(科技-2016-02-004)
关键词
道路工程
防水体系
正交试验
敏感性
拉拔试验
road engineering
waterproof system
orthogonal test
sensitivity
pull-out test