摘要
郑州地铁1号线一期车辆采用TSG18G1型受电弓,由中车株洲电力机车有限公司电气设备分公司提供。文章结合GB50157-2003地铁设计规范及1号线车辆合同技术规格书,对郑州地铁1号线一期车辆受电弓的选型进行讨论,同时为郑州地铁后续线路及其他城市地铁车辆受电弓选型提供参考。
The TSG18G1 pantograph is used in the first phase of Zhengzhou Metro Line 1, provided by the Electric equipmentBranch of Zhuzhou Electric Locomotive Co., Ltd. This paper discusses the selection of the pantograph for the first phase ofZhengzhou Metro Line1 based on the GB50157-2003 Metro Design Code and the Technical Specification of the contract for vehicleson Line 1. At the same time, it providesa reference for the selection of pantograph for Zhengzhou subway and other metro vehicles.
出处
《科技创新与应用》
2018年第29期51-52,共2页
Technology Innovation and Application
关键词
地铁车辆
受电弓
选型
郑州地铁
subway vehicle
pantograph
selection
Zhengzhou Metro