期刊文献+

水轮发电机组增容改造可行性研究分析 被引量:6

Feasibility Study of the Capacity Expansion of Hydro-turbine Generator Units
下载PDF
导出
摘要 十三五期间中国将有一批水电站进入老龄化阶段。从水轮机增容改造和发电机增容改造两个方面对老电站增容改造可行性进行了分析,认为水轮发电机组经过水轮机、发电机定子、转子、通风冷却系统改造后,能取得较好的增容改造效果。 During the 13 th Five-year plan period,a large number of hydropower stations in China will enter the ageing stage. The feasibility of the capacity expansion of old hydropower stations are studied from two aspects,the hydro-turbine capacity expansion and the generator capacity expansion. It shows that a satisfied capacity expansion could be achieved by renovations of the hydro-turbine,the generator stator and rotor,and the ventilation cooling system.
作者 耿清华 GENG Qinghua(China Datang Corporation Science and Technology Research Institute,Nanning 530029,China)
出处 《水电与新能源》 2018年第9期41-43,共3页 Hydropower and New Energy
关键词 水轮机 发电机 增容改造 hydro-turbine unit generator capacity expansion
  • 相关文献

参考文献4

二级参考文献6

共引文献41

同被引文献18

引证文献6

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部