期刊文献+

国家重大水电工程建设劳动竞赛工作探析——以中国三峡集团乌东德水电站为例 被引量:2

Work Competition in the Construction of National Major Hydropower Projects——A Case Study of Wudongde Hydropower Station
下载PDF
导出
摘要 中国三峡建设管理有限公司乌东德工程建设部在国家重大水电工程乌东德施工区开展"践行新理念,建功十三五"主题的劳动竞赛工作,因地制宜创新工作方式,充分调动广大建设者的积极性和创造性,显著发挥了工人阶级主力军作用,有力推动乌东德水电站"十三五"创新型示范工程建设。 In the construction of Wudongde Hydropower Station,a national major hydropower project in China,work competition themed as "New Ideas,Great Contributions"is held in the construction area by the project construction department to fully mobilize the enthusiasm and creativity of the workers,and to innovate the work methods according to local conditions. It greatly promotes the construction of the project as an innovative demonstration project in the 13 th Fiveyear Plan.
作者 李华 姚品品 王若愚 LI Hua;YAO Pinpin;WANG Ruoyu(Wudongde Project Construction Department,China Three Gorges Corporation,Kunming 650041,China;Three Gorges Hydropower Plant,China Yangtze Power Co.,Ltd.,Yichang 443133,China)
出处 《水电与新能源》 2018年第9期44-47,52,共5页 Hydropower and New Energy
关键词 重大水电工程 劳动竞赛 探析 national major hydropower projects work competition discuss
  • 相关文献

共引文献14

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部