摘要
介绍了减薄泄漏的DN500mm污水管线在-20℃低温环境下带压封堵与更换经验,包括风险分析、消减措施、方案确定等根据工程概况完成的分析与策略,土方挖掘、测厚确定封堵位置、制作伴热管线和搭设暖棚、封堵设备保温和试运、制作封堵设备支撑等准备细节,三通扣件焊接、安装夹板阀、打压开孔、投放筒式封堵器、切断管线增加阀门、安装堵塞和盲盖等操作程序,工程难点和注意事项总结等。实现了20h完成由焊接扣件到封堵结束的完整作业过程,顺利完成了更换管线工作,可为同类生产装置低温环境下改造施工提供参考。
Practical experiences of slugging and replace of sewage pipeline of a diameter of 500 mm under pressure and a low environmental temperature of-20 ℃ are introduced,which contains analysis and treatment according to the project general information,preparations,working procedure,the difficulties and precautions.Items including risk analysis,firefighting measures,solutions,civil works,thickness and slugging location determination,prepare of heat tracing pipeline and setup of warming shelter,installing and commissioning of slugging machine,prepare support structure for slugging machine,tee and fastener welding,installation of special sandwich valve,building up pressure and opening holes,putting down the cylinder plugging machine,cutting off pipeline and adding valves,installing plug and blind cover are detailed.A whole process from welding fasteners to the end of the plugging are achieved within 20 hours,which can be a reference for the similar project.
作者
张新伟
王乃燕
ZHANG Xin-wei;WANG Nai-yan(Ethylene Plant of Dushanzi Petrochemical Company,CNPC,Dushanzi 833699,China;Xinjiang Huanqiu Contracting & Engineering Co.Ltd.,Dushanzi 833699,China)
出处
《石油化工设备》
CAS
2018年第5期65-69,共5页
Petro-Chemical Equipment
关键词
污水管线
封堵
更换
带压
低温
sewage pipeline
plugging
replace
under pressure
low temperature