近距离煤层工作面支架工作阻力确定方法

Determination of Working Resistance of Support in Working Face of Short Distance Coal Seam
下载PDF
导出
摘要 在平朔井工一矿近距离煤层协同开采的背景下,对4号煤14106工作面支架工作阻力进行确定。利用经验公式和数值模拟的手段,分析模拟不同支护强度条件下上方顶板下沉位移情况,确定顶板下沉位移与工作面支架支护强度之间存在的规律,最终选出合理支架。 Under the background of coal seam comining in Pingshuo mine, the working resistance of support in 14106 face of coal face is determined. By means of empirical formula and numerical simulation, the subsidence displacement of top roof under different support strength conditions is analyzed, and the law between roof subsidence displacement and support strength of working face is determined, and the reasonable support is selected finally.
作者 魏斌 剧锦茂 Wei Bin;Ju Jinmao(Shanxi Zhonggang Coal Industry Co.,Ltd.,Lyuliang Shanxi 033400;Taiyuan University of Technology,Taiyuan Shanxi 030024)
出处 《机械管理开发》 2018年第9期96-98,共3页 Mechanical Management and Development
关键词 近距离煤层 支架工作阻力 数值模拟 close distance coal seam support working resistance numerical simulation
  • 相关文献

参考文献6

二级参考文献49

共引文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部