3Bansal V K. Application of geographic information systems in construction safety planning[J]. International Journal of Project Management, 2011, 29 ( 1 ): 66-77.
4Li H, Guo H, Skibniewski M J, et al. Using the IKEA model and virtual prototyping technology to improve construction process management[J] . Construction Management and Economics, 2008, 26 ( 9 ): 991-1000.
5Benjaoran V, Bhokha S. An integrated safety management with construction management using 4D CAD model[J]. Safety Science, 2010, 48 (3): 395-403.
6Guo H L, Li H, Chan G, Skitmore M. Using game technologies to improve the safety of construction plant operations[J]. Accident Analysis and Prevention, 2012, 48: 204-213.
9Bajaj R, Ranaweera S L, Agrawal D P. GPS: location-tracking technology[J]. Computer, 2002,35( 4 ): 92-94.
10Xia W, Yang S X, Li X, et al. Design of wireless sensor networks for safety monitoring at civil engineering construction sites[C].//Mechanic Automation and Control Engineering ( MACE ), 2011 Second International Conference on. IEEE, 2011: 6418-6421.