摘要
针对在已建地铁正上方修筑道路工程,特别是地铁车站周边、盾构上方的路基处理与填筑,提出了适宜的实施方案,既满足道路工程质量要求,又保证地铁结构不受影响,着重讨论地铁站周边的软基处理。
Aiming at the road construction project above the built metro, especially the roadbed treatment and filling surrounding the metro station and above the shield, the article puts forward the suitable implementation scheme not only satisfying the road engineering quality requirements, but also guaranteeing the metro structure to be not affected, and discusses the treatment of the soft foundation surrounding the metro.
出处
《城市道桥与防洪》
2018年第9期102-104,共3页
Urban Roads Bridges & Flood Control
关键词
道路与地铁共线
路基处理
地铁车站周边
盾构上方
road and metro collineation
roadbed treatment
surrounding metro station
above shield