大跨径组合梁斜拉桥概念设计 被引量:2

Conceptual Design of Long-span Composite Girder Cable-stayed Bridges
下载PDF
导出
摘要 组合梁斜拉桥有向大跨径发展的趋势,重点明确大跨径组合梁斜拉桥概念设计阶段应该考虑的主要技术问题。从合理跨径界限、总体布置及主要参数等方面,对该桥型概念设计所应把握的规律及要点进行分析论述。从剪力滞后、收缩徐变、剪力钉滑移、非线性、合理成桥及施工状态确定等力学效应方面,对该桥型关键问题的技术动态进行阐述。最后指出,概念设计对大跨径组合梁斜拉桥的实践与发展十分重要。 The composite girder cable-stayed bridge has the great potential for development to longer span.In this paper, the principal technical issues of composite girder cable-stayed bridges that should be considered at the conceptual design stage are clarified. In the aspects of reasonable span limit, general arrangement and main structure parameters, the laws and essentials that should be well understood in the conceptual design of the type of the bridge are analyzed and expounded. The technical trends of the key issues on the mechanical effects, such as shear lag, shrinkage and creep, slip of shear studs, nonlinearity,decision of reasonable finished bridge and construction state are described. Finally, the vital importance of conceptual design to the practice and development of composite girder cable-stayed bridge is emphasized.
作者 陈亮 邵长宇
出处 《城市道桥与防洪》 2018年第9期111-114,共4页 Urban Roads Bridges & Flood Control
关键词 大跨径 斜拉桥 组合梁 概念设计 long span cable-stayed bridge composite girder conceptual design
  • 相关文献

参考文献5

二级参考文献27

  • 1王迎军,朱桂新,陈旭东.虎门大桥钢桥面铺装的使用和维护[J].公路交通科技,2004,21(8):64-67. 被引量:53
  • 2吴冲,曾明根,邵长宇,刘小方.大跨度组合箱梁斜拉桥混凝土收缩与徐变应力分析[J].世界桥梁,2004,32(B09):37-41. 被引量:11
  • 3TDV,2003,RM-Spaceframe Users Manual,rev8.58-02.
  • 4苗家武 裴岷山 徐利平.苏通大桥主航道桥几何非线性影响比较研究[C]..中国公路学会桥梁与结构工程学会桥梁学术会议论文集[C].中国成都:人民交通出版社,2003..
  • 5Janjic D,Pircher M,Pircher H.Optimisation of Cable Tensioning in Cable-Stayed Bridges[J].Journal of Bridge Engineering,ASCE,2003,8 (3):131-137.
  • 6同济大学桥梁系.苏通长江公路大桥主桥斜拉桥结构非线性影响分析研究报告[R].上海:同济大学,2004..
  • 7Jean-Paul Teyssandier. Corinthian Crossing[J]. Civil Engineering Magazine, 2002,(10):42-49.
  • 8G Morgenthal,G M Calvi. Dynamic Behavior and Passive Seismic Control of the Rion Bridge[A] . Proceedings of Fourth Symposium on Strait Crossings[C] .Bergen:2001.
  • 9Felber A, Taylor P, Griezic A, etal. Erection Geometry and Stress Control of Composite Decked Cable- Stayed Bridges[z]. Seoul, Korea: 2001.
  • 10Oliveira Pedro J J, Reis A J. Nonlinear Analysis of Composite Steel-Concrete Cable-Stayed Bridges [J]. Engineering Structures, 2010, 32(9).. 2 702--2 716.

共引文献101

同被引文献22

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部