特厚煤层综放工作面小煤柱开采设备改造及生产工艺 被引量:8

Thick Coal Seam Fully-mechanized Caving Small Coal Pillar Mining Equipment Modification and Production Process
下载PDF
导出
摘要 煤矿回采工作面停采线位置涉及到盘区预留煤柱大小的问题,是每一个生产矿井都必须面临选择的问题。特厚煤层综采放顶煤工作面选择预留小煤柱开采有其显著优势,回采煤量多,回收率高,经济效益好。为了实现特厚煤层综采放顶煤工作面小煤柱开采,必须有相适应的配套设备及其生产工艺。以塔山煤矿8110工作面停采线150 m减少到80 m开采实践为例,介绍特厚煤层综放工作面小煤柱停采设备改造及生产工艺的技术内容、设计参数、观测数据和实施效果。总结设计思路、实施经验和研究成果。 Coal mining face stopped mining line position involves the panel set aside problem, the size of coal pillar is a production of mines have to face a choice. Choice set aside special thick seam fully mechanized top coal caving mining faces small coal pillar mining has its significant advantages, back to the coal quantity, high recovery rate, better economic benefit. In order to achieve the small coal pillar mining thick coal seam fully mechanized top coal caving mining faces, there must be adapted to form a complete set of equipment and production technology. Based on the Tashan coal mine 8110 face stopped mining line 150 m to 80 m mining practice as an example, introduce, small coal pillar stopping mining thick coal seam fully-mechanized sublevel caving mining working face equipment modification and production process of technical content, design parameters, observation data and implementation effect.
作者 王淑博 刘大同 Wang Shubo(Mining Products Safety Approval and Certification Center Co.,Ltd.,Beijing 100013,China)
出处 《煤矿机械》 北大核心 2018年第9期109-111,共3页 Coal Mine Machinery
关键词 工作面 停采线 小煤柱 设备改造 生产工艺 working face stop picking line small coal pillar equipment modification production process
  • 相关文献

二级参考文献18

共引文献13

同被引文献46

引证文献8

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部