期刊文献+

基于演化博弈的建筑企业应用BIM的激励机制研究

Research on the incentive mechanism of construction enterprises application BIM technology based on evolutionary game
下载PDF
导出
摘要 为探究建筑企业应用BIM的激励机制,针对不同策略下政府和企业各自的成本和收益,基于演化博弈理论构建了BIM应用中政府与企业的演化博弈模型,分析了BIM应用中政府与企业的博弈过程。博弈分析结果显示:该系统的演化结果敏感依赖于初始时双方对各自策略的选择比例,而这种比例会受到选择这种策略带给双方收益大小的影响。文章基于演化博弈分析结果,提出了针对性的策略建议。 In order to explore the incentive mechanism of construction enterprises application BIM, this paper, which is based on their respective costs and benefits of government and construction enterprises under the different strategies, uses evolutionary game theory to construct the evolutionary game model between government and construction enterprises in the application of BIM and analyzes the game process between government and construction enterprises in the application of BIM. The results of the game analysis show that: the evolutionary results of the system sensitively depend on the selection proportion of their respective strategy at the beginning and this proportion is affected by the outcomes of choosing this strategy. Based on the results of the evolutionary game analysis, the corresponding countermeasures and suggestions are put forward.
作者 郭三伟 GUO San-wei(China Railway SIYUAN Survey and Design Group Co.,Ltd.,Wuhan 43006)
出处 《铁道勘测与设计》 2018年第4期64-68,共5页 Railway Survey and Design
关键词 BIM 应用 演化博弈 演化稳定策略 BIM application evolutionary game evolutionary stable strategy
  • 相关文献

参考文献5

二级参考文献36

  • 1王刚,高燕辉.BIM时代的项目管理[J].建筑经济,2011,32(S1):34-37. 被引量:18
  • 2张人友,王珺.BIM的内涵[J].工业建筑,2012,42(S1):34-36. 被引量:33
  • 3Azhar S, I-lein M, Sketo B. Building Information Mod- eling ( BIM ) : Benefits, Risks and Challenges [ C ]// Proceedings of the 44th ASC National Conference. 2008.
  • 4住房和城乡建设部.2011-2015年建筑业信息化发展纲要[R].北京:住房和城乡建设部,2011.
  • 5National Institute of Building Sciences. United States National Building Information Modeling Standard, Ver- sionl [ R]. USA: National Institute of Building Sci- ences ,2007.
  • 6The American Institute of Architects. Integrated Project Delivery: A Guide[ M]. USA: The American Institute of Architects, 2007.
  • 7Olofsson T, Lee G, Eastman C. Editorial-Case studies of BIM in use [ J]. IT in Construction, 2008, 13: 244-245.
  • 8Carmona J, Irwin K. BIM: who, what how and why [J/OL]. [2012-7-15]. http:// www. facilitiesnet. corn/software/article/BIM -who-what -how-and-why- 7546#.
  • 9Hardin B. BIM and Construction Management: Proven Tools, Methods, and Workflows [ M ]. Canada: John Wiley & Sons, 2011.
  • 10Glick S, Guggemos A. IPD and BIM: Benefits and Opportunities for Regulatory Agencies [ C ]//Proeeesi- ngs of the 45th Associated Schools of Construction (ASC) Annual Conference, Gainesville, FL, 1-4 A- pril. Pacific Northwest National Laboratory ( PNNL), 2009.

共引文献137

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部