摘要
山西古县西山圪堆煤业开采的3#煤层属于近距离开采煤层,该煤层中的11301工作面在回采巷道掘进过程中矿压明显,在大断面的切眼巷道中,支护困难。在切眼实际施工中,矿上试验一次成巷技术,采用"锚杆+锚索+金属网+套棚+点柱"联合支护方式,避免了二次扩巷对顶板造成的扰动,切眼掘进顺利完成,巷道支护可靠,顶板压力被有效控制。相比切眼二次成巷技术,一次成巷技术掘进速度更快,支护成本更低。
The No.3 coal seam in Gedui Mine is close-distance mining.The 11301 coal face of the coal seam,with obvious mine pressure in the driving,is difficult to be supported in the largesection cut-off roadways.In the actual construction,simultaneous drifting was tested using the joint supporting method with bolts,anchors,metal meshes,shed-truss,and pointed pillars to avoid the disturbance on the roof caused by the secondary expansion and realize the smooth cut-off tunneling,reliable supporting,and effective control of roof pressure.Compared with the secondary tunneling,the simultaneous drifting is faster and its supporting cost is lower.
作者
李朝胜
LI Chaosheng(Xishan Gedui Coal Co.,Ltd.,Linfen 042404,China)
出处
《山西煤炭》
2018年第4期20-21,36,共3页
Shanxi Coal
关键词
近距离煤层
大断面
切眼
一次成巷
支护技术
close distance coal seam
large cross section
cut off
simultaneous drifting
supporting technology