摘要
基于洛川110 kV线路这一电力工程造价控制的实例,首先介绍工程概况,然后详细论述洛川110 kV线路工程的投资情况,进一步通过工程初设阶段、工程招投标阶段、合同签订阶段、工程施工阶段及工程竣工验收阶段这几个关键环节探讨电力工程造价管理的对策。
Based on the example of cost control of power project in Luochuan 110 kV transmission line, the generalsituation of the project is introduced, and then the investment situation of 110 kV line project in Luochuan is discussedin detail. This paper probes into the countermeasures of power engineering cost management in the stage of signing thecontract, the construction stage and the acceptance stage of the completion of the project.
作者
张琴
Zhang Qin(Shanxi Jitong Electric Power Development Co.,Ltd.,Taiyuan Shanxi 030012)
出处
《现代工业经济和信息化》
2018年第12期92-94,共3页
Modern Industrial Economy and Informationization
关键词
电力工程
造价
投资
对策
power engineering
cost
investment
countermeasures