基建新站中远动信号验收用时的探讨 被引量:2

Discussion on Acceptance Time of Tele-control Signal in New Built Station
下载PDF
导出
摘要 本文通过分析新建变电站自动化远动三遥验收的内容和方法,建立一个量化的信号验收时间模型,进而推导出三遥数据量的验收时间,为基建新站合理安排工程进度,明确调度数据通讯连接、质监验收、变电站启动等关键节点时间提供依据。 The content and method of acceptance of automatic remote signaling 3 in new built station were analyzed. A quantitative signal acceptance time model was established. Then, the acceptance time of three remote data was deduced. The reference of clear scheduling data communication links, quality supervision acceptance, substation start-up and other key node time were provided for reasonable arrangement of project progress of new station f construction.
作者 王伟光 WANG Weiguang(Guangzhou Power Supply Bureau Co.,Ltd.,Guangzhou 510000,China)
出处 《电工技术》 2018年第18期98-100,106,共4页 Electric Engineering
关键词 远动 遥信 遥测 遥控 验收用时 tele-control remote signaling telemetry remote control acceptance time.
  • 相关文献

参考文献2

二级参考文献10

共引文献5

同被引文献15

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部