摘要 以小断面隧道快速出渣为研究目的,结合肯尼亚供水隧道一期工程实例,采用有轨与无轨联合出渣,即在坡度缓的主隧道采用有轨出渣,在坡度陡的斜井支洞采用无轨出渣,斜井支洞和主隧道交汇处设置临时堆料区,斜井洞口设置无极绳绞车牵引有轨设备进出隧道,有效提高了主隧道出渣作业效率,缩短了洞挖循环作业时间,同时,也改善了洞内作业环境,减少了在洞内布置充电房检修车间等增加的额外工程量。 This paper aims at studying rapid mucking out in small cross-section tunnel in the project of bulk water supply for Nairobi in Kenya, in which rail bound and non-rail bound mucking out system are used together. The rail bound mucking out system is used in the main tunnel where the slope is smooth and the non-rail bound mucking out system is used in the adit or shaft where the slope is steep. Temporary stockpiling area is set at the intersection of the adit/ shaft and the main tunnel. Endless rope winch system is installed at the portal of the adit/ shaft which effectively improves the effciency of the main tunnel mucking out work, shortens the excavation cycle pending time, improves the tunnel working environment, and reduces quantities increased by setting up workshop in the tunnel.
作者 张雷雨 ZHANG Lei-yu(No.5 Engineering Co.,Ltd.of China Gezhouba Group,Yichang 443002,China)
出处 《电力勘测设计》 2018年第9期69-73,共5页 Electric Power Survey & Design
关键词 小断面隧道 主隧道有轨出渣 斜井支洞无轨出渣 临时堆料区 无极绳绞车 small cross-section tunnel rail bound mucking out in main tunnel non-rail bound mucking out in inclined shaft temporary spoil stacking area endless rope winch.
  • 相关文献

参考文献1

同被引文献7

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部