期刊文献+

建筑物碳排放量和成本的优化设计研究 被引量:2

Optimization Design on Carbon Emissions and Cost of Buildings
下载PDF
导出
摘要 建筑行业的碳排放量是全球碳排放量的第二大主体.由于建筑物的碳排放量和成本有着密切的关系,因此设计优化时需同时考虑碳排放量和成本两个变量以寻求降低碳排放量和成本的最佳方案.本研究提出基于建筑信息模型(BIM)技术模拟建筑物的能耗和碳排放量,以及通过统计建筑物工程量进而快速准确地计算出全寿命周期碳排放量和成本的数值,然后基于粒子群算法(PSO)对全寿命周期碳排放量和成本同时进行多目标优化,最后选择最优的设计方案,以促进建筑业的可持续发展. The construction industry has become the second contributor of greenhouse gas emissions to the environment. Because the carbon emissions of a building have a close relationship with its cost, both carbon emissions and cost should be considered in order to find the optimal plan to reduce both carbon emissions and cost in the design phase. In this paper, the building information modeling(BIM) is used as the basis for the simulation of the energy consumption and carbon dioxide emissions of a building, and also for the rapid and accurate calculation of the number carbon dioxide emissions(LCCE) and eosts(LCC) in a life cycle. In addition, LCCE and LCC are optimized with multi-objectives step by step based on particle swarm optimiza-tion(PSO). Finally, the optimal design plan is chosen in order to promote the sustainable development of the construction industry.
作者 蒲云辉 王清远 李文渊 王小鹃 PU Yunhui;WANG QingyuanI;LI Wenyuanl;WANG Xiaojuanl(School of Architecture and Civil Engineering,Chengdu University,Chengdu 610106,China;Institute of New Energy and Low-carbon Teehnology,Sichuan University,Chengdu 610065,China;Key Laboratory of Failure Meehanies and Engineering Disaster Prevention Mitigation of Siehuan Provinee,Siehuan University,Chengdu 610044,China)
出处 《成都大学学报(自然科学版)》 2018年第3期326-330,共5页 Journal of Chengdu University(Natural Science Edition)
基金 四川省科技厅科技支撑计划(2015GZ0245) 成都大学校青年基金(2018XZB19)资助项目
关键词 碳排放因子法 建筑信息模型 粒子群算法 全寿命周期碳排放 全寿命周期成本 carbon emission factor method building information modeling particle swarm optimization lifecycle carbon emissions life cycle costs
  • 相关文献

参考文献3

二级参考文献39

  • 1张磊,王要武,姚兵.基于碳排放权交易的绿色住宅融资机理研究[J].土木工程学报,2011,44(S1):220-224. 被引量:1
  • 2贾瑞娟,徐春霞.专家意见的可信度与综合可信度[J].河北建筑科技学院学报,2003,20(4):83-84. 被引量:18
  • 3马国丰,尤建新.基于熵的项目目标柔性控制的定量分析[J].上海交通大学学报,2007,41(7):1058-1060. 被引量:7
  • 4McCuen, T.L., Suermann, EC., Krogulecki, M.J. Evaluating award-winning BIM projects using the national Building Information Model standard capability maturity model[J]. Journal of Management in Engineering, 2012 (2) .. 224-230.
  • 5Laakso, M., Kiviniemi, A. The IFC standard: A review of history, development, and standardization[J]. Journal of Information Technology in Construction, 2012 (9) : 134-161.
  • 6Tantisev, K., Somsuriya K. Building information model for evaluating the building energy performance: a case study[C]// Proceedings of the Intemational Conference on Computing in Civil and Building Engineering, 2010.
  • 7粱波.基于BIM技术的建筑能耗分析在设计初期的应用研究[D].重庆:重庆大学,2014.
  • 8Akintoye, A., Fitzgerald, E. A survey of current cost estimating practices in the UK[J]. Construction Management andEeonomic, 2000 (2) : 161-172.
  • 9云鹏,钟崇光.面对绿色建筑的BIM基础数据结构标准化初探[C]∥第十届绿色建筑与建筑节能大会论文集,2014.
  • 10任玉珑,王建,牟刚,王恒炎.基于CA模型的电力设备全寿命周期成本研究[J].工业工程与管理,2008,13(5):63-66. 被引量:9

共引文献10

同被引文献31

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部