1000MW机组高效真空泵组项目的技术经济性分析 被引量:1

Technical and economic analysis of high efficiency vacuum pump unit for 1000MW unit
下载PDF
导出
摘要 为了考查安徽某电厂2×1000MW工程采用高效真空泵组项目的技术经济性,先拟定高效真空泵组方案,1台机组总投资595828元,1台高效真空泵组运行电流从原先170A左右下降到44A左右,因此1台机组1年可节约厂用电880866kWh,电价按0.384元/kWh计算,1年可产生效益338253元,按静态投资回收期法来计算,不到1.8年即可收回投资,技术经济性优良。 In order to examine the technical and economical efficiency of the 2×1000MW project of a power plant in Anhui, the high efficiency vacuum pumpunit was first developed. The total investment of 1 units was 595828 yuan, and the operating current of 1 high efficient vacuum pumps decreased from about 170A to about 44A, so 1 units could save 880866kWh for 1 years and 0 per kilowatt hour 0.384 yuan calculation, 1 years can generate 338253 yuan, calculated according to the static investment recovery period, less than 1.8 years to recover the investment, the technology and economy is excellent.
作者 何升旗 吴志祥 HE Sheng-qi;WU Zhi-xiang
出处 《节能》 2018年第9期73-77,共5页 Energy Conservation
关键词 高效真空泵组 静态投资回收期 技术经济性 分析 high efficiency vacuum pump group static investment recovery period technical and economic analysis
  • 相关文献

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部