摘要
2013年9月—2017年6月,吉林省有色金属地质勘查局六〇四队受矿权人:桦甸市世纪三和矿业有限公司委托对吉林省桦甸市老牛沟区金矿详查项目进行地质勘查工作,取得了较好的地质效果。本人于2015~2016年参加了本项目中坑探工程的设计、施工技术的指导及质量验收工作。本文根据探明的107-1号主矿体的矿体特点及水文地质条件等对其进行了开采设计分析。
From September 2013 to June 2017,team 604,Bureau of Nonferrous Metals Geological Exploration of Jilin Province, was entrusted by file owner of exploration right: Huadian ShijiSanhe Mining Co.,Ltd. to conduct geological exploration for the gold deposit detailed investigation project in Laoniugou area, Huadian City of Jilin Province, and achieved good geological results. From 2015 to 2016, I participated in the design, construction technology guidance and quality acceptance of file tunnel engineering. Based on the characteristics of No. 107-1 ore body and its hydrogeological conditions, file mining design of file main ore body is analyzed in this paper.
作者
于志鹏
YU Zhi-peng(Team 604,Bureau of Nonferrous Metals Geological Exploration of Jilin Province,Jilin 132000,Jilin,China)
出处
《吉林地质》
2018年第3期72-74,共3页
Jilin Geology
关键词
干式充填
采矿
回采工艺
Dry filling
mining
mining technology