期刊文献+

基于Revit二次开发的PC建筑预制率计算方法研究 被引量:10

Research on Calculation Method for PC Building Prefabrication Rate Based on Revit Secondary Development
下载PDF
导出
摘要 为改进目前预制装配式建筑预制率手工计算存在效率低下、误差加大的问题,本研究利用建筑信息模型BIM技术,通过对Revit软件的二次开发,实现了对基于BIM模型的预制装配式混凝土建筑(Precast Concrete,简称PC)预制构件工程量的自动统计和预制率的自动计算,验证了基于Revit平台计算PC建筑预制率的可行性。利用本文的二次开发成果,通过不同构件预制率的动态选择组合,可以估算建设成本,进而选择成本可接受范围内的预制方案,增加经济效益,为决策者制定预制方案提供决策依据。 In order to improve the current prefabricated building prefabrication rate calculation, and to solve the problems of low efficiency and large error existed in the manual calculation, this study applies the BIM technologyto achieve the automatic statistics of precast concrete components and automatic calculation of precast rate for a PC building based on its BIM model through the secondary development on Revit, which verifies the feasibility of calculating PC building precast rate based on Revit platform. Based on the results of secondary development in this paper, the construction cost can be estimated directly when selecting different combinations of prefabrication rates, and then the prefabrication schemes within acceptable cost range can be selected, to increase economic benefits, and to provide decision-making basis for decision makers to formulate prefabrication schemes.
作者 陈远 康虹 Chen Yuan;Kang Hong(School of Civil Engineering,Zhengzhou University,Zhengzhou 450001,China)
出处 《土木建筑工程信息技术》 2018年第4期12-16,共5页 Journal of Information Technology in Civil Engineering and Architecture
关键词 装配式建筑 BIM 预制率 Revit二次开发 Prefabricated Construction BIM Prefabrication Rate Secondary Development on Revit
  • 相关文献

参考文献5

二级参考文献35

  • 1王要武,吴宇迪.智慧建设及其支持体系研究[J].土木工程学报,2012,45(S2):241-244. 被引量:44
  • 2秦佑国,韩慧卿,俞传飞.计算机集成建筑系统(CIBS)的构想[J].建筑学报,2003(8):41-43. 被引量:17
  • 3张弘,秦佑国.计算机集成建筑系统(CIBS)构想实现的前提[J].建筑学报,2007(5):92-94. 被引量:6
  • 4沈阳建筑大学课题组.装配整体式建筑工程成本分析研究报告[R].沈阳建筑大学.2013.
  • 5沈阳建筑大学课题组.装配整体式建筑工程综合效益分析研究报告[R].沈阳建筑大学,2015.
  • 6Kunz J, Fischer M, Haymaker J, et al. Integrated & Automated Project Processes in Civil Engineering: Ex- periences of the Center for Integrated Facility Engi- neering at Stanford University [ R ]. California: CIFE Technical Report #132 February, 2002 .
  • 7Teicholz P, Fischer M. Strategy for computer integrated construction technology [ J ]. Journal of Construction Engineering and Management, 1994, 120 ( 1 ) : 117- 131.
  • 8Suzuki N, Akiba J, Whorlow J. A Study on Effective Construction Management Utilising Civil Information Modeling/Management ( CIM ) [ C ]//2014 Interna- tional Conference on Computing in Civil and Building Engineering. Orlando: ASCE,2014 : 1489-1496.
  • 9Tatum C,Luth G. Integrating Structural and Construc- tion Engineering[ C ]//Construction Research Congress 2012. West Lafayette :ASCE,2012 : 1301-1310.
  • 10Kurdziel J, Nelson C, Nystrom J. Intelligent Construc- tion Systems: the Convergence of Computing, Commu- nication and Construction [ C ]//Joint Conference on Water Resource Engineering and Water Resources Planning and Management 2000. Minneapolis : ASCE,2000 : 1-9.

共引文献341

同被引文献107

引证文献10

二级引证文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部