摘要
结合业主需求和当地供电部门要求,对北京市某以办公建筑为主的综合项目供电方案设计的要点进行分析总结,包括负荷分级及计算、供电方案确定、变配电室和发电机(房)设置、分界室设置、低压配电设计,以及电动汽车充电桩负荷计算等。
Combined with the owner' s requirements and the requirements of the local power supply authority, the design essentials of the power supply scheme for the integrated project centered around a office building in Beijing are analyzed and summarized, including load classification and computation, determination of power supply scheme, setting of transformer and distribution room and generator (room), setting of separation room, low-voltage distribution design and load computation of charging piles for electromobiles, etc.
作者
史泽刚
刘畅
贾京花
SHI Zegang;LIU Chang;JIA Jinghua(Tangshan Mingjia Architectural Design & Consultion Co.,Ltd.,Tangshan 063000,Hebei Province,China;China Architecture Design & Research Group,Beijing 100044,China)
出处
《建筑电气》
2018年第9期9-15,共7页
Building Electricity
关键词
负荷分级
负荷计算
变配电室
变压器
发电机(房)
10
kV供电
分界室
电动汽车充电桩
load classification
load computation
transformation and distribution room
transformer
generator (room)
10 kV power supply
separation room
charging piles for electromobiles