摘要
CFG桩复合地基处理技术是一种应用比较广泛的地基处理方式。根据郑州逸泉国贸酒店工程现场地质条件,结合工程实际情况,设计采取CFG桩进行地基处理。介绍了CFG桩的设计及施工情况。检测结果表明,在高层甚至是超高层建筑中,在保证施工质量的前提下,采用CFG桩复合地基处理技术是可行的基础方案。
CFG pile composite foundation treatment technology is a widely used foundation treatment method. Ac cording to the site geological conditions of Yiquanguomao Hotel project and the actual situation of the project, the CFG pile is designed for the foundation treatment. The design and construction of CFG pile are introduced. The test results show that the application of CFG pile composite foundation treatment technology is a feasible basic scheme under the premise of ensuring construction quality in high rise and even super high rise buildings.
作者
谌霞
刘建涛
CHEN Xia;LIU Jian-tao(Hcnan Acro Geophysical Survey and Remote Sensing Center,Zhengzhou Henan 450053,China;Henan Geological Environ ment Exploration Institute,Zhengzhou Henan 450007,China)
出处
《探矿工程(岩土钻掘工程)》
2018年第9期89-92,共4页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
CFG桩
复合地基
高层建筑
CFG pile
composite foundation
high rise building