期刊文献+

BIM技术在鄂北水资源配置渡槽施工中的应用 被引量:3

Application of BIM Technology in the Construction of Water Resources Allocation Aqueduct in Northern Hubei Province
下载PDF
导出
摘要 为了有效解决鄂北地区水资源配置工程渡槽施工的重点和难点问题,借助BIM技术,建立了现浇渡槽支撑架、模板和渡槽结构的三维模型,将BIM技术应用于碰撞检测、深化设计、方案模拟及优化、工程量统计、进度控制等方面,一定程度上提高了渡槽施工的效率及信息化管理水平,可为`类似工程提供借鉴。 In order to effectively solve key and difficult problems in the construction of aqueduct in the water resources allocation project in northern area of Hubei Province, with the help of BIM technology, a three-dimensional model of cast-in-place aqueduct support frame, template and aqueduct structure is established. The application of BIM technology to collision detection, deepening design, scheme simulation and optimization, engineering quantity statistics, and schedule control has improved the efficiency and information management level of aqueduct construction to a certain extent, and can provide reference for similar projects.
作者 彭军 李翔 PENG Jun;LI Xiang(Cuangdong NO.3 Water Conservancy and Hydro-Electric Engineering Board Co.,Ltd,Dongguang 523710,China)
出处 《广东水利水电》 2018年第9期6-8,15,共4页 Guangdong Water Resources and Hydropower
关键词 渡槽 BIM技术 仿真模拟 信息化 aqueduct BIM technology simulation informatization
  • 相关文献

参考文献3

二级参考文献27

  • 1熊世雄,王垚,温剑,王宜军,莫春.BIM技术在钢桥工程的应用研究[J].铁路技术创新,2014(2):68-70. 被引量:7
  • 2L Y Ding, Y Zhou, B Akinci. Building Information Modeling ( BIM ) application framework: The process of expanding from 3D to computable nD[J]. Automation in Construction, 2014 (46): 82-93.
  • 3M Yalcinkaya, V Singh. Patterns and trends in Building Information Modeling ( BIM ) research: A Latent Semantic Analysis[J]. Automation in Construction, 2015,59 : 68-80.
  • 4L V Berlo, T Krijnen. Using the BIM Collaboration Format in a Server Based Workflow[J]. Procedia Environmental Sciences, 2014 ( 22 ): 325 332.
  • 5Hu Z, Zhang J. BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction .. 1 . Principles and methodologies[J]. Automation in Construction, 2011, 20 (2): 167-180.
  • 6深圳市建筑工务署政府公共工程BIM应用实施纲要,2015.
  • 7S S. Kumar, C. P. ChengA BIM-based automated site layout planning framework for congested construction sites[J]. Automation in Construction, 2015, 59- 24-37.
  • 8中华人民共和国住房和城乡建设部年建筑业信息化发展纲要[EB/OB].2011.5-10.
  • 9Johansson M, Roup6 M, Bosch-Sijtsema P. Real-time visualization of building information models ( BIM ) [J]. Automation in Construction, 2015 ( 54 ): 69-82.
  • 10Grilo A, Jardim-Goncalves R. Value proposition on interoperability of BIM and collaborative working environments[J]. Automation in Construction, 2010, 19 ( 5 ): 522-530.

共引文献130

同被引文献31

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部