期刊文献+

大跨度转体施工工艺拱桥施工阶段稳定性问题研究 被引量:1

Study on stability of arch bridge during construction of long span rotating body construction technology
下载PDF
导出
摘要 对采用转体施工工艺的三种大跨径上承式钢筋混凝土箱型拱桥,分别建立有限元模型。提取了一阶及二阶失稳模态,对转体施工阶段稳定性进行对比研究。结果表明,宽跨比在1/20以内的开口箱,在转体施工阶段,安全系数基本能满足要求;宽跨比较大,开口箱高度相对较高时,安全系数较高;转体阶段,在L/4处拱圈上缘可能会出现拉应力。 The finite element models of three kinds of reinforced concrete box arch bridges with long span and upper span are established respectively. The first-and second-order instability modes are extracted. The results show that the safety factor of the open box with a wide span ratio of less than 1/20 can meet the requirements in the construction stage of the rotating body. When the wide span is large and the opening box height is relatively high,the safety factor is high. In the transformation stage,the tensile stress may occur at the upper edge of the arch ring at L/4.
作者 郝景宏 Hao Jinghong(Enshi State Transportation Planning and Design Co. , Ltd, Enshi 445000, China)
出处 《山西建筑》 2018年第26期167-168,共2页 Shanxi Architecture
关键词 有平衡重转体 上承式钢筋混凝土 箱型拱桥 模态分析 equilibrium weight top bearing reinforced concrete box arch bridge modal analysis
  • 相关文献

参考文献3

二级参考文献1

  • 1蔡绍怀.现代钢管混凝土结构[M].北京:人民交通出版社,2003..

共引文献3

同被引文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部