摘要
结合具体工程实例,介绍了木兰松花江大桥使用中纬Zenith15Pro GPS设备进行整体项目控制网联测及桥位施工控制网的联测,确保了大桥施工满足质量及精度要求。
Combining with engineering cases,this paper introduces emphatically the integrated project control network survey and the joint survey of bridge construction control network using Zenith15 Pro GPS equipment in Mulan Songhua River Bridge. It is ensured that the construction of the bridge meets the requirements of quality and precision.
作者
王天成
李昂
张思远
李胜利
Wang Tiancheng1, Li Ang1, Zhang Siyuan2, Li Shengli1(1. Harbin Vocational & Technical College, Harbin 150081, China; 2. Longjian Road & Bridge Co. , Ltd, Harbin 150000, China)
出处
《山西建筑》
2018年第26期206-208,共3页
Shanxi Architecture
基金
黑龙江省教育科学"十三五"规划2018年度重点课题(课题编号:GZB1318008)
关键词
木兰松花江大桥
中纬GPS
控制网联测
平面控制网
Mulan Songhua River Bridge
mid-latitude GPS
control network joint survey
horizontal control network