摘要 对于大多数成品油管道,制定可行的批次计划方案,往往需要考虑管道类型多变、站场作业方式多变、各类工艺约束等要求。以批次需求型成品油管道为研究对象,选取管道沿线所有管段运行流量整体平稳性最高作为目标函数,综合考虑批次跟踪、管段流量、中间站分输与注入、末站分输、站场需求等约束条件,采用离散时间表达方式建立了管道中间站批次计划优化的混合整数线性规划(MILP)模型。以某成品油管道为例,选取8 h为时间步长离散计划期,利用CPLEX软件计算获得管道中间站批次计划最优方案。优化结果表明,利用所建立的MILP模型产生的批次计划具有较强的可实施性。(图3,表3,参20) For most products pipelines, drafting feasible batch schedules are difficult works that different types of pipelines, different operating modes of stations and many process constraints must be considered. This paper proposes a mixed- integer linear programming (MILP) model using the discrete-time expression for optimizing batch schedules of intermediate stations along a products pipeline that is based on the batch-demand mode. In the MILP model, the objective is to seek the highest stability of pumping rates of all pipeline segments along a pipeline. The constraints, i.e., batch tracking, pumping rate of pipeline segments, delivery and injection of intermediate stations, delivery of the terminal station and demand of stations are comprehensively considered. The proposed MILP model solved by CPLEX is successfully tested on a products pipeline. By setting the discrete time step to be 8 hours, the optimal batch schedules of intermediate stations are achieved. The results show that the batch schedules provided by the proposed MILP have a strong practicability. (3 Figures, 3 Tables, 20 References)
作者 陈海宏 左丽丽 吴长春 刘鸣 王莉 刁逢 CHEN Haihong;ZUO Lili;WU Changchun;LIU Ming;WANG Li;DIAO Feng(CNOOC Research Institute;College of Mechanical and Transportation Engineering,China University of Petroleum(Beijing)
出处 《油气储运》 CAS 北大核心 2018年第9期1000-1004,1012,共6页 Oil & Gas Storage and Transportation
关键词 成品油管道 顺序输送 批次计划 最优化 混合整数线性规划 products pipeline batch transportation batch schedule optimization mixed-integer linear programming
  • 相关文献

参考文献3

二级参考文献82

  • 1Moro L F L, Pinto J M. A mixed integer programming approach for short term crude oil scheduling [J].Industrial and Engineering Chemistry Research, 2004, 43: 85.
  • 2Rejowski Jr R, Pinto J M. A novel continuous time representation for the scheduling of pipeline systems with pumping yield rate constraints [J].Computers and Chemical Engineering, 2008, 32 (4-5): 1042-1066.
  • 3Christodoulos A Floudas, Xiaoxia Lin. Continuous-time versus discrete-time approaches for scheduling of chemical processes [J].Computers and Chemical Engineering, 2004, 28 (11): 2109-2129.
  • 4Rejowski R Jr, Pinto J M. Scheduling of a muhiproduct pipeline system [J].Computers and Chemical Engineering, 2003, 27 (8-9) : 1229-1246.
  • 5Shah N. Mathematical programming techniques for crude oil scheduling [J]. Computers and Chemical Engineering, 1996, 20: 1227- 1232.
  • 6Yee K L, Shah N. Improving the efficiency of discrete time scheduling formulation[J]. Computers and Chemical Engineering, 1998, 22: 403-410.
  • 7Rejowski R Jr. , Pinto J M. Efficient MILP formulations and valid cuts for multiproduct pipeline scheduling [J] . Computers and Chemical Engineering, 2004, 28 (8) : 1511-1528.
  • 8Georgios K D Saharidis, Michel Minoux, Yves Dallery. Scheduling of loading and unloading of crude oil in a refinery using event-based discrete time formulation [J] . Computers and Chemical Engineering, 2009, 33 (8): 1413-1426.
  • 9Maravelias C T, Grosmann I E. New general continuous time state-task network formulation for short-term scheduling of multipurpose batch plants[J]. Industrial and. Engineering Chemistry Research, 2003, 42: 30-56.
  • 10Mendez C A, J Cerdd. An efficient MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities [J].Computers and Chemical Engineering, 2002, 26 (4): 687-695.

共引文献30

同被引文献27

引证文献6

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部