期刊文献+

钢筋套筒灌浆连接的高温性能有限元分析 被引量:7

FEM analysis on behavior of gout-filled pipe splice connector in high temperature
下载PDF
导出
摘要 近年来,随着我国住宅产业化的发展,装配式建筑逐渐成为住宅建设应用的一个重要发展方向。钢筋的套筒灌浆连接是装配式结构中钢筋连接的主要技术之一,其高温下的力学性能亟待研究。采用ABAQUS有限元分析软件建立了高温下钢筋套筒连接的受力性能分析模型,着重分析了D25、D20、D16等3种钢筋直径的套筒连接在高温下的滑移和极限承载力。研究表明,在常温下,套筒连接的锚固长度取为8d能够满足受力要求。随着温度升高,灌浆料和钢筋的性能退化,连接的滑移增加,极限承载力下降;钢筋直径越小,连接在高温下的性能越难保证。即使是在高温下,套筒始终处于弹性范围。 In recent years, with the development of housing industry, the precast assembly building has gradually become a significant development tendency in residential construction engineering. A gout-filled pipe splice connector is one of the key techniques of joining steel reinforcement bars in precast assembly structures, but the study on the mechanical properties of this kind of connection in high temperature is very urgent and necessary. A mechanical analysis model of gout-filled pipe splice under the high temperature was established by ABAQUS, mainly analyzing the slip and the ultimate bearing capacity of the connections of three series with diameters of 25 mm, 20 mm, and 16 mm. The research shows that the anchorage length of the bar as 8d at room temperature can meet the requirement. However, the behavior of grouting material and steel bars deteriorates with the increase of temperature, which also leads to the increasing in slip and decreasing in ultimate bearing capacity. When the diameter of the steel bars becomes smaller, it is difficult to ensure the behavior of the connection under the high temperature, and the sleeves are in elastic range all along under the high temperature.
作者 王国庆 毛小勇 WANH Guoqing;MAO Xiaoyong(School of Civil engineering,SUST,Suzhou 215011,China)
出处 《苏州科技大学学报(工程技术版)》 CAS 2018年第3期19-26,共8页 Journal of Suzhou University of Science and Technology(Engineering and Technology Edition)
基金 江苏省"六大高峰"人才项目(2012-JZ-004) 江苏省高校自然科学基金重大项目(14KJA560003) 江苏省333人才项目(2016)
关键词 套筒灌浆连接 高温 轴向拉伸 粘结锚固 连接性能 gout-filled pipe splice connector high temperature axial tension bond-anchorage connection performance
  • 相关文献

参考文献6

二级参考文献42

  • 1CECS43-92.钢筋混凝土装配整体式框架节点与连接设计规程[S].北京:中国建筑工业出版社,1992.
  • 2徐芝纶.弹性力学[M].北京:高等教育出版社,2006.
  • 3JGJl07--2010钢筋机械连接技术规程[S].北京:中国建筑工业出版社.2010.
  • 4钢筋连接用灌浆套筒(征求意见稿)[S].2011.
  • 5钢筋套筒连接用灌浆料(征求意见稿)[S].2011.
  • 6Preeast/Prestressed Concrete prestressed system saves money Journal, 1973,18 (3) : 10-13.
  • 7Institute. New precast in Hawaii hotel[ J]. PCI NMB Splice-sleeve systems historical events [ EB/OL]. [ 2007-7-2 ]. http://www, splicesleeve, corn/history. html.
  • 8ACI Committee 439. Mechanical connections of reinforcement bars[ R]. 1983:24-35.
  • 9EINEA A, YAMANE T,TADROS M K. Grout-filled pipe splices for precast concrete construction [ J ]. PCI Journal, 1995, 40( 1 ) :82-93.
  • 10LING J H,ABD RAHMAN A B, MIRASA A K, et al. Performance of CS-sleeve under direct tensile load: part 1: failure modes [ J ]. Malaysian Journal of Civil Engineering, 2008, 20( 1): 89-106.

共引文献276

同被引文献26

引证文献7

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部