摘要
介绍了智能变电站二次系统联调的基本内容和主要流程,分析了二次联调对于智能变电站设备互操作性和同步性验证的重要作用,指出二次联调是智能变电站建设过程中不可或缺的一环,并以220kV智能变电站二次系统联调过程为例,探讨了联调各部分的具体方案,总结了联调所需设备配置和注意事项,对联调过程中的部分关键问题提出了建议及解决方案.
This paper firstly introduces the main contents and process of smart substation integrated testing, and then it analyses the important role that integrated testing plays in the check of the correlation among relay system. A viable project is proposed for the test when discussing the process of 220kV smart substation integrated testing. Besides, the paper points out several matters needing attention which are significant to the test of relay systems.
作者
丁鸿
杨勇
韩磊
童大中
DING Hong;YANG Yong;HAN Lei;TONG Dazhong(Huzhou Power Supply Company,State Grid Zhejiang Electric Power Corporation,Huzhou 313000,China)
出处
《湖州师范学院学报》
2018年第8期42-45,共4页
Journal of Huzhou University
关键词
智能变电站
二次系统
联合调试
方案
smart substation
relay system
integrated testing
project