超特高压防感应电通用接地线的研制与应用 被引量:1

Development and Application of General Ground Line for Ultra-special High Voltage Induction Prevention
下载PDF
导出
摘要 针对超特高压线路在挂设接地线时面临灼伤导线和夹头、夹头脱落、跳线为硬质铝管时无法挂设、挂设难度大等问题进行分析,研制了消弧装置、防脱落夹头、硬质铝管专用夹头和操作杆支持装置,有效地减少可能存在的安全隐患,并在生产中进行使用.经实践检验,该制品具有很好的推广和应用价值. Through the analysis of the problems such as the burning wire and the chuck, the chuck off, the jumper line being hard aluminum pipe and the difficulty in hanging up when the grounding wire is hung in the ultra high voltage line, the arc extinguishing device, the anti shedding chuck, the special chuck of the hard aluminum pipe and the support device of the rod are developed, which can effectively reduce the potential safety hidden danger. It has been used in production and tested by practice, and the product has a good popularization and application value.
作者 刘平平 张健 方杰 俞强 覃金彩 LIU Pingping;ZHANG Jian;FANG Jie;YU Qiang;QIN Jingcai(Huzhou Power Supply Company,State Grid Zhejiang Electric Power Corporation,Huzhou 313000,China;State Network Zhejiang Electric Power Maintenance Branch,Hangzhou 310000,China)
出处 《湖州师范学院学报》 2018年第8期50-53,共4页 Journal of Huzhou University
关键词 输电线路 超特高压 感应电 接地线 夹头 导线 Transmission lines Ultra high pressure Induction Grounding lines Clip Wire
  • 相关文献

参考文献5

二级参考文献21

  • 1郭剑波.我国电力科技现状与发展趋势[J].电网技术,2006,30(18):1-7. 被引量:43
  • 2GB50545-2010,110KV-750kV架空输电线路设计规范[S].
  • 3DL/T741-2010,架空输电线路运行规程[S].
  • 4DL409-1991,电业安全工作规程(电力线路部分)[S].
  • 5DL/T 5092-1999 110-500kV架空送电线路设计技术规程[S],1999.
  • 6DL409-1991电业安全工作规程(电力线路部分)[s].1991.
  • 7DL/T621-1997交流电气装置的接地[s].1998.
  • 8安德生J G.超高压输电线路[M].北京:水利电力出版社,1979.
  • 9DI/621.1997,交流电气装置的接地[s].1998.
  • 10DL/T879.2004,带电作业用便携式接地和接地短路装置[s].

共引文献33

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部